The client needed to reduce their energy consumption and requested an audit of their production process. The process included; chiller, air compressor, furnace, dryer, blowers, fans and process water systems.
In addition to the site assessment and utility usage documentation, the study included analysis of:
- Compressed Air systems and users
- Water systems and users
- Electrical systems
- Furnace Fuel systems and users
Recommendations of the potential projects with cost estimates were provided. The largest savings were determined in the heat reclaim, air user savings, water user savings, air compressor control and electrical demand charge management.
Type Of Industry
- Automobile Glass Manufacturing
Tools & Skills Utilized
- Process engineering
- Utility usage evaluation
- Cost estimation