ADF was tasked with designing a new building adjacent to the existing structure with a limited footprint to avoid interferences with existing structures and truck access.
ADF Engineering enhanced a sugar railcar unloading system for a sweetener and beverage manufacturer, increasing the unloading rate from 22,000 lb/hr to 60,000 lb/hr.
ADF Engineering assisted a chemical company in increasing production by 10% initially and an additional 20% by addressing inefficiencies and optimizing various systems.
A chemical company working with Lysine wanted to develop an overall facility site map drawing to show secondary containment volumes for each process area.