skip to Main Content

Boiler Design and Installation

Our client requested ADF’s services to design and implement a new 100,000 pound per hour natural gas-fired boiler into their existing steam and condensate process. The equipment was located in a new pre-engineered metal building at their lysine production facility,…

Read More

Waste Water Treatment Plant Installation

The client needed to replace their undersized waste water treatment (WWT) facility while maintaining plant production. The new WWT facility was designed to treat process water and rainwater at a combined rate of 500 gallons per minute, and then discharge…

Read More

Soy Product Loadout Facility

Our client wanted to replace their loadout system and move it to a new location within their international shipping facility. The new system needed to deliver a soy product into 40-foot sea containers at a rate of 100 tons per…

Read More